Most full bathroom renovations in Stockport land somewhere between £5,000 and £12,000, but the spread is wide and the reasons are rarely obvious from a brochure. The age of your house, what is hiding behind the old tiles and how far you move the plumbing matter more than which taps you pick. Here is how the numbers tend to break down locally, and what to check before you compare quotes.
These figures are for a complete strip out and refit, including labour, materials and a mid-range suite. They are guide ranges based on typical local jobs, not fixed prices, and your own quote will depend on a proper survey of the room.
Labour is usually the biggest single cost, often 40 to 50 per cent of the total. A bathroom needs a plumber, a tiler, an electrician, a plasterer and often a joiner, and a typical job takes one and a half to three weeks from strip out to final silicone.
The suite itself is often a smaller share than people expect. A decent bath, basin, toilet, shower valve and screen can be bought for £1,200 to £2,500, while tiles and tiling labour can easily match that in a fully tiled room. Large format porcelain and natural stone take longer to fit and need flatter walls, so the fitting cost rises along with the price per square metre.
Also allow for the parts nobody photographs: waste removal and skip hire, new pipework and isolation valves, an extractor fan, moisture resistant boarding, tanking in the shower area, and making good the plaster.
Stockport has a lot of Victorian and Edwardian terraces in areas such as Edgeley, Heaton Moor and Shaw Heath, along with 1930s semis across Cheadle Hulme, Bramhall and Hazel Grove. Older properties are lovely to work on, but they tend to hold surprises.
The most effective saving is keeping the toilet, basin and bath roughly where they are. Reusing existing waste and supply positions can take several days of labour out of a job.
Think about where you tile. Full height tiling in the shower and around the bath, with a half height or painted finish elsewhere, looks smart and reduces both materials and labour. Mid-range porcelain in a standard size is far quicker to fit than tiny mosaics or oversized slabs.
Spend where it counts instead: a good quality shower valve, a solid shower tray or properly tanked floor, and a decent extractor fan. These are the parts that are expensive to put right later. Cheap brassware hidden behind a tiled wall is a false economy.
Ask for a written, itemised quote after a visit to the house, not a figure given over the phone. It should state who supplies the suite and tiles, whether waste removal, plastering, electrics and decorating are included, and how unexpected problems will be priced if they appear once the room is stripped.
Electrical work in a bathroom falls under Part P of the Building Regulations, so it should be carried out and certified by a registered electrician, or signed off through Stockport Council building control. Keep a contingency of around 10 per cent, particularly in an older house, and be wary of any quote that is far below the others without a clear reason.
A straightforward like for like refit usually takes around two weeks. Allow three weeks or more if the layout is changing, the walls need re-plastering or you are having a wet room.
Not normally, as internal refits do not need planning permission. Building Regulations still apply to electrics, drainage changes and ventilation, and listed buildings or structural alterations need separate consent, so check with Stockport Council if you are unsure.
It can be, but not always once delivery, returns and missing parts are factored in. Agree it with your fitter first, because they will usually only guarantee products they have supplied and you will be responsible if something arrives wrong or damaged.
Based in Stockport. Working across Cheshire and surrounding areas.