What Does a Full House Refurbishment Involve in Stockport?

Searching for full house refurbishments near you usually means a property needs more than a new kitchen or a quick redecorate. This guide explains what a whole house project involves, the order the work usually follows, and what affects time and cost, for homeowners and landlords in Stockport, Cheshire and the surrounding areas.

Published 2026-11-23 · Full Renovations · Stockport

What a full refurbishment usually covers

A full house refurbishment brings a whole property up to a sound, modern standard instead of tackling one room at a time. Around Stockport that is often a Victorian or Edwardian terrace with tired wiring and awkward rooms, or a 1930s semi that has had little done to it in decades. The scope depends on the property, but most projects include some or all of the following.

The order the work follows

Getting the sequence right saves money, because nothing finished should have to be pulled out again. Work normally starts with strip-out and any structural changes, such as removing walls or forming new openings. Structural work usually needs building regulations approval, and sometimes a structural engineer's calculations, before it begins.

Next comes first fix: new cables, pipework and any joinery that will be hidden behind walls. Plastering follows, then second fix, which is fitting sockets, switches, radiators, sanitaryware and doors. Kitchens, tiling, flooring and decorating come last. Gardens and outside work are often done at the end, or in parallel if access allows.

How long it takes and what affects the cost

For a typical two or three bedroom house, a full refurbishment commonly takes somewhere between two and four months. A light refresh with a new kitchen and bathroom sits at the shorter end. A project with a rewire, layout changes and a loft conversion can run longer. Lead times on kitchens, windows and doors can affect the programme as much as the building work itself.

Cost depends heavily on the size of the property, how much is hidden behind the walls, and the finish you choose. Rewiring, replumbing and structural changes are where budgets grow, while the choice of kitchen, tiles and flooring decides much of the rest. It is sensible to keep a contingency of around 10 to 15 percent for things only found once work starts, such as rotten joists, old lead pipework or damp. A detailed, itemised quote makes it much easier to see where the money goes and to compare options.

Living in, or letting out, during the work

Many homeowners move out for the noisiest stages, especially when the kitchen, bathroom and electrics are all out of action at once. If you are staying in, the work can sometimes be phased so you keep one working bathroom and somewhere to cook, though this usually adds time.

Landlords, particularly HMO landlords, have extra things to plan for. Refurbishing an HMO often means adding en-suites, upgrading fire doors and alarm systems, and making sure room sizes and facilities meet the local council's licensing standards. Check what Stockport Council, or the council covering your property, requires before work is designed, not after, because changing fire safety work later is costly.

Choosing someone to run the whole job

A full refurbishment involves building, joinery, plumbing, electrics, plastering and finishing trades. Hiring them all separately leaves you coordinating the order of work yourself. A firm that handles most trades in-house and runs the project as one job, with one point of contact, usually means fewer delays and less confusion when something changes.

When you compare quotes, look for a clear breakdown of what is included, a payment plan linked to stages of work, and an idea of how you will be kept updated. Ask to see photos of similar whole house projects, and read reviews that mention how the job was managed, not just the finish.

Questions

Asked and answered.

Do I need planning permission for a full house refurbishment?

Most internal refurbishment work does not need planning permission, but structural changes, rewiring and some plumbing work fall under building regulations. Loft conversions, extensions and work on listed buildings or in conservation areas may need planning approval as well, so check before you commit to a design.

Can a full refurbishment be done in stages to spread the cost?

Yes, but it works best when the hidden work, such as wiring and pipework, is done across the whole house first. Finishing rooms one at a time on top of that avoids ripping out new work later.

Do you cover areas outside Stockport?

Ashburys Property Renovations works across Stockport, Cheshire and the surrounding areas, including Didsbury, Sale, Altrincham, Wilmslow and Macclesfield. Get in touch with the property's location and a rough idea of the work for an initial visit.

Got a job that needs doing? Get a free quote this week.

Get a quote

Tell us about the job.

Call us

 

Leave a message if we're on the tools, we call back.

WhatsApp

Message us

Send photos of the job for a faster quote.

Email

 

Plans, drawings or a list of what needs doing.

Coverage

Based in Stockport. Working across Cheshire and surrounding areas.

Either way it comes straight to us. WhatsApp opens a message with your details filled in, and emails us a copy at the same time.